Notification close image
No new Notification messages
card image
Seshaasai Technologies Ltd IPO
Apply for the Seshaasai Technologies Ltd IPO through UPI in Just minutes
delete image
card image
Start your SIP with just ₹100
Choose from 4,000+ Mutual Funds on Bajaj Broking
delete image
card image
Open a Free Demat Account
Pay ZERO maintenance charges for the first year, get free stock picks daily, and more.
delete image
card image
Trade Now, Pay Later with up to 4x
Never miss a good trading opportunity due to low funds with our MTF feature.
delete image
card image
Track Market Movers Instantly
Stay updated with real-time data. Get insights at your fingertips.
delete image

NTPC Green Energy Begins 130.47 MW Commercial Operations from Khavda Solar

Synopsis:


NTPC Green Energy has started commercial operations of 130.47 MW from the Khavda-I Solar PV Project in Gujarat under CPSU Phase-II, Tranche-III, effective 29 January 2026, raising total group installed capacity to 8,478.25 MW.


Source:
NTPC Press Release (NSE Exchange Fillings) | Published on Jan 28, 2025

Disclaimer: This content has been published for informational purposes only. Bajaj Broking is not affiliated with, nor does it endorse or assume any responsibility for, the source material. Readers are advised to consult the original publication for complete and accurate context.

As quoted in the press release of NTPC (NSE Exchange Filings), a 130.47 MW segment of the Khavda-I Solar PV Project in Gujarat has entered commercial operation per the announcement made by NTPC Green Energy Limited (the renewable power subsidiary of NTPC Limited) at 00:00 hrs (local time) on 29/01/2026. This represents the 10th tranche of the CPSU Scheme Phase-II, Tranche-III being put in place for commercial supply.

Also Read: Akzo Nobel India Board Approves Proposal to Change Company Name

Ntpc Green Energy Limited

Trade

93.33-0.23 (-0.24 %)

Updated - 29 January 2026
94.00day high
DAY HIGH
92.38day low
DAY LOW
1160485
VOLUME (BSE)

Key Takeaways

  • NTPC Renewable Energy commenced commercial operations of 130.47 MW from the Khavda-I Solar PV Project.

  • The capacity addition is effective from 29 January 2026.

  • The project forms part of the CPSU Scheme Phase-II, Tranche-III.

  • NTPC Green Energy’s total installed capacity rises to 8,478.25 MW.

Commercial Operation of Khavda-I Solar Project

Operationally, 130.47 MW is the declared part capacity. This is part of the overall 1255 MW Khavda I Solar PV Project in Gujarat. The Khavda I Solar PV project is being developed by NTPC Renewable Energy Ltd., a 100% owned subsidiary of NTPC Green Energy Ltd., under CPSU scheme Phase II, Tranche III is being developed under the CPSU Scheme Phase II, Tranche III, and the commencement of commercial operation for this tranche was effective at midnight on January 29, 2026.

The Khavda I Solar PV Project was brought online in staged increments. When each tranche was declared in commercial operation, the Group's cumulative capacity continued to be built. NTPC Green Energy now has an overall installed capacity of 8478.25 MW.

Also Read: Sai Life Sciences Enters Mabtech Pact for Immunology Research

Broader Capacity Context

Prior to adding 130.47 MW of capacity to its portfolio, NTPC Green Energy had a total operational solar capacity of only 8,347.78 MW. Therefore, with the additional capacity, the total operational solar capacity is now much larger. In addition, the new capacity is being created as part of further developments of the Khavda solar assets.

Below is a concise summary of capacity details linked to this news:

Particular

Detail

Project Name

Khavda-I Solar PV Project

Location

Gujarat, India

Capacity Added

130.47 MW

Scheme

CPSU Phase-II, Tranche-III

Effective COD

29 January 2026

NTPC Green Energy Total Installed

8,478.25 MW

Impacts on Renewable Portfolio

The declaration of operational commercial electricity generation by NTPC Green Energy is part of its ongoing efforts to grow its renewable energy portfolio further. With the phased approach to completing large solar generation projects, such as Khavda-I, certain segments becoming operational can be accomplished as soon as they are complete.

This declaration supports NTPC Green Energy's overall objective of increasing solar generation capacity and adding to the overall renewable capacity of the NTPC Group's total portfolio.

Share Price Update

NTPC share price stands at ₹233.50 per share on the BSE as of 28 January 2026 at 15:30 PM IST, down marginally by 0.25% from the previous session.

Also Read: TCS Incorporates Moroccan Subsidiary to Expand Nearshore IT Services Globally

Published Date : 29 Jan 2026

Disclaimer :

The information on this website is provided on "AS IS" basis. Bajaj Broking (BFSL) does not warrant the accuracy of the information given herein, either expressly or impliedly, for any particular purpose and expressly disclaims any warranties of merchantability or suitability for any particular purpose. While BFSL strives to ensure accuracy, it does not guarantee the completeness, reliability, or timeliness of the information. Users are advised to independently verify details and stay updated with any changes.

The information provided on this website is for general informational purposes only and is subject to change without prior notice. BFSL shall not be responsible for any consequences arising from reliance on the information provided herein and shall not be held responsible for all or any actions that may subsequently result in any loss, damage and or liability. Interest rates, fees, and charges etc., are revised from time to time, for the latest details please refer to our Pricing page.

Neither the information, nor any opinion contained in this website constitutes a solicitation or offer by BFSL or its affiliates to buy or sell any securities, futures, options or other financial instruments or provide any investment advice or service.

BFSL is acting as distributor for non-broking products/ services such as IPO, Mutual Fund, Insurance, PMS, and NPS. These are not Exchange Traded Products. For more details on risk factors, terms and conditions please read the sales brochure carefully before investing.

Investments in the securities market are subject to market risk, read all related documents carefully before investing. This content is for educational purposes only. Securities quoted are exemplary and not recommendatory.

[ Read More ]

For more disclaimer, check here : https://www.bajajbroking.in/disclaimer

Read More Blogs

Our Secure Trading Platforms

Level up your stock market experience: Download the Bajaj Broking App for effortless investing and trading

Bajaj Broking App Download

11 lakh+ Users

icon-with-text

4.8 App Rating

icon-with-text

4 Languages

icon-with-text

₹7,900+ Cr MTF Book

icon-with-text